Paving Works

CLIENT: ARBOR FOREST PRODUCTS LIMITED

Project description

The contract is for the conversion of a greenfield site into a timber storage area.

The works consisted of a full drainage system to accommodate an area of nine acres with the installation of 900mm through to 400mm diameter pipes and an ‘Aco’ drainage system running down both lengths of the full area. A ditch was piped using 1200mm diameter pipes and numerous manholes along the line. All run-off of water from the site was diverted into a newly constructed lagoon, which held the water and then pumped back to the treatment tanks on site.

The area of concrete paving totalled 22,500 square metres with lighting tower bases and ductwork.