Steel-Framed Warehouse

CLIENT: UNDISCLOSED

Project description

We are in the process of constructing a steel framed and composite cladded building, consisting of driven piled foundations & piled floor slab, the building will be lined out using hygienic white walling with part of the warehouse being  divided into process areas.

The warehouse will have a symphonic drainage system which will run of into a surface water drainage system with attenuation and hydro brakes to restrict the flow of run of into the main drainage network, external concrete paving will be placed to create a laydown area for the client and turning circles for  incoming and outgoing transport.