Hull Bulk Handling Facility

CLIENT: HULL BULK HANDLING LIMITED

Project description

Works involved the construction of new bulk store - 125 meters x 60 meters. The portal frame was to be founded on the top of 6 meter high reinforced concrete walls. The bulk store perimeter foundation fully piled with driven pre-cast concrete piles.

Roof cladding consist of 40mm composite panels with single skin cladding to walls. 

A 67.5 x 8 meter wide loading canopy was constructed to the South Eastern elevation. This was constructed on piled foundations with single skin cladding extending down to the floor slab. Floor slabs in the main store and the loading canopy are ground bearing designed to take the proposed loadings.

Roof drainage will discharge directly into a new rain water harvesting tank.   

Piles foundations provided for the materials handling conveyor system.



Project Details

Services Involved:

YOUR PROJECT

    Other Projects

    • New Holland Extraction: Warehouse, Offices and Production Facility
    • Pigpro Egg Colony
    • Brackenborough Hotel, Louth: Function Room
    • Co-op Store, Ulceby
    • New Holland Bulk Services: Structural Repairs to Jetty
    • C.F. Booth: Steel Processing Building